We replaced a faulty shower unit with a client-supplied 8.5kW Mira Jump unit and ensured proper functionality through comprehensive testing.
In this project, we replaced an old, faulty shower unit with a new, client-supplied 8.5kW Mira Jump unit. To accommodate the new unit, we re-routed the copper piping and made the necessary connections, ensuring a secure and proper fit.
After the installation, we performed thorough water and electrical tests to confirm that everything was working correctly. These tests included checking for water leaks and verifying the electrical functionality of the new shower unit. The successful completion of these tests ensured that the shower unit was safe and ready for use.
By the end of the project, the new Mira Jump shower unit was fully operational, providing the client with a reliable and efficient showering solution.
Ready to make a difference? Explore exciting career opportunities with us!