A full outbuilding electrical installation carried out at a residential property in Helston. The work covered a new dedicated circuit from the consumer unit, an SWA cable run to the shed across the rear garden, and a complete internal fit-out with socket outlets and LED lighting - all certified on completion.
Getting power out to a garden shed sounds straightforward enough, but doing it properly takes a bit of thought. The route matters, the cable type matters, and so does how the supply is managed back at the house. This job in Helston covered all of that – a new circuit from the consumer unit through to a fully fitted shed interior, completed over two days.
The starting point was the existing consumer unit inside the property. A dedicated 20A MCB circuit breaker was added to serve the new outbuilding supply. Working from a split load distribution board gives a clean, organised starting point, and having the shed on its own breaker means it can be isolated independently if needed.
From the consumer unit, cabling was routed out through the front exterior wall and taken up to roofline height within white 20mm PVC conduit. This was installed parallel to the existing conduit runs on the property – keeping the exterior tidy and consistent. Once at the roof level, the cable was routed through the loft space, clipped neatly to the rafters and taken across towards the rear of the property. The loft section covered around 20 metres in total.
Before leaving the loft and heading outside again, the supply was jointed and converted from standard twin and earth cable to Steel Wire Armoured (SWA) cable. SWA is the right choice for any external or underground run – the steel wire armouring provides mechanical protection against impact, and the cable is rated for outdoor conditions. It’s not a cable you’d normally use internally, but for the exposed section of the run it’s the appropriate specification.
The SWA was then clipped down the rear exterior wall – approximately 5 metres – and routed along the fence line for around 6 metres before entering the shed. The fence line route keeps the cable out of the way and limits any visual impact in the garden. Inside the shed, roughly 3 metres of cable was allowed for the termination point, giving a clean and manageable connection point to work from.
With the supply in and terminated, the internal fit-out could begin. Three surface-mounted double socket outlets were installed within the shed, positioned to serve the intended use – including running two chest freezers, with additional sockets at each end of the space for tools or other equipment. All cabling was clipped directly to the exposed timber structure of the shed, following the lines of the framework to keep things neat and accessible.
Lighting was the final part of the internal works. A 5ft LED batten was fitted to give good, even coverage across the shed – the sort of light that’s actually useful rather than just present. The supply for the fitting was taken from the main shed supply via a switched fused connection unit, positioned near the door. This acts as both the control point and the means of isolation for the light, which is a clean and practical way to wire a single fitting in this kind of space.
An Electrical Installation Certificate was completed for all of the works carried out, covering both the new circuit and the internal installation. The certificate documents that the work has been tested and verified against current wiring regulations – which matters for insurance purposes and for any future sale of the property.
Shed electrics are one of those jobs that get put off, often because people aren’t sure what’s involved or how far it’s going to go. In practice, a well-planned installation like this one is a two-day job, and the result is a space that actually works – proper lighting, enough sockets to run what’s needed, and a supply that’s been done correctly from the consumer unit outward.