Our Projects

Check out some of our most recent projects below.  Click on a project for more information.

September 2025

Silent running bathroom extractor fan installation in Truro featuring chrome finish, timer overrun facility, and comprehensive ducting maintenance for optimal moisture control.

September 2025

Progress update on our solar panel installation during a complete home refurbishment. The project features multiple roof arrays being fitted across different sections to maximise renewable energy generation once complete.

September 2025

Professional EV charger installation in St. Austell featuring a 7.4kW MyEnergi Zappi untethered charge point with intelligent load monitoring and underground cable routing for optimal performance and property protection.

August 2025

Professional Wall Box EV charger installation in Newquay garage with 40A circuit protection and 32-amp charging capability for reliable home electric vehicle charging.

August 2025

Moving exterior lights and conduit systems to accommodate building upgrades whilst maintaining electrical safety and functionality in Falmouth properties.

August 2025

Modern electric vehicle charging solution installed in Liskeard featuring an Ohme ePod 7.4kW untethered charge point with advanced load monitoring technology and surge protection for safe, efficient home charging.

August 2025

Modern electrical installation throughout a Carnon Downs property featuring LED downlights, USB charging sockets, pendant lighting and upgraded bathroom ventilation systems for improved comfort and functionality.

August 2025

Electrical safety inspection and testing service completed in Wadebridge, providing detailed assessment of existing electrical circuits and installation condition through professional EICR certification.

August 2025

Installation of dedicated electrical circuits and external power supply for air conditioning units, featuring weatherproof isolator switches and professional cable routing through existing infrastructure.

August 2025

Modern driveway bollard lighting installation in Chacewater featuring three contemporary lighting columns with automated timer and daylight sensor controls for enhanced property security and visual appeal.

August 2025

Consumer unit replacement upgrading from outdated rewireable fuses to modern RCBO protection with integrated surge protection device. Installation includes upgraded meter tails, circuit testing, and full electrical certification to current 18th Edition standards.

August 2025

PIV installation in Truro hallway providing controlled ventilation with integrated heating element for year-round comfort and condensation control.
NAPIT Approved Electrical Logo
BPEC
City & Guilds
Ohme
HyperVolt
EO
My Energi
Lutron
GivEnergy
Loxone
read more
read less