Swapping out an existing Google Nest system for a Hive Active Heating setup in a St Columb home, providing smart control over the heating system through a fully commissioned wireless thermostat and Wi-Fi-enabled hub.
Complete kitchen extractor replacement with external venting through soffit and light switch upgrade for a home in Lostwithiel, providing improved ventilation and updated lighting controls.
Installation of two Rointe electric radiators in a Newquay property, providing efficient electric heating solutions for a hallway and bedroom with professional fitting and commissioning.
Upgrading an oil combi boiler heating system with a Hive Active Heating Control system in Roche, including smart thermostat, receiver and Wi-Fi hub installation with full network integration and commissioning.
First fix kitchen electrics completed for a home in Shortlanesend, Cornwall, involving socket circuit extensions and cooker circuit alterations to accommodate a reconfigured kitchen layout.
Installation of a humidistat-controlled extractor fan in a Chacewater kitchen, complete with external venting, dedicated switching, and concealed cabling prepared for decoration.
Installing a 7.4kW Sync EV charge point for a Falmouth property, complete with load monitoring technology to prevent electrical system overload and protect the existing infrastructure.
A property in Bodmin required a complete consumer unit upgrade alongside remedial works identified during electrical safety testing. The existing installation had reached the end of its service life, prompting the need for a modern replacement with integrated surge protection to safeguard connected electronics and bring the system in line with current regulations.
Installation of a 7.4kW MyEnergi Zappi EV charge point at a property in Cubert, making use of existing infrastructure whilst upgrading the electrical protection to support reliable electric vehicle charging.
Complete first-fix electrical installation across a first floor conversion in Bodmin, featuring three bedrooms with en-suite and wardrobe facilities, plus family bathroom and landing areas, all within a timber frame construction.
Relocating a heating air sensor to a more practical position above kitchen cupboards in Mylor Bridge, extending control cabling and making good where necessary to maintain a clean, professional finish.