A residential property in Camborne required electrical work to accommodate a new dual cooking setup. The existing single outlet needed upgrading to safely power both an oven and hob, with proper installation of the appliances onto their designated mounting points
A domestic property in Redruth required electrical work to bring the shower circuit up to standard and add additional power points. The job involved relocating an isolator switch, removing unsafe junction box connections, and installing new circuits for a heated towel rail and dining room socket.
A complete lighting upgrade for a Truro property, replacing outdated downlights with modern LED fittings throughout the kitchen and bathroom, alongside new hallway wall lights for improved functionality and style.
Following an electrical inspection at a commercial building in Falmouth, we upgraded a 32A 3-phase socket outlet by replacing the existing non-protected unit with a modern outlet featuring integrated RCD protection. The work addressed safety concerns and brought the installation in line with current electrical regulations.
Modern LED downlight installation with dimmer control and smart heating setup for a holiday accommodation in Mevagissey, transforming guest bedroom lighting whilst integrating radiator controls into the Rointe Connect app system.
Complete electrical upgrade from single-phase to three-phase power supply for a busy Newquay cafe, including new consumer unit installation, dedicated circuits for commercial kitchen equipment, and comprehensive socket distribution across food preparation areas.
A homeowner in Truro needed their faulty electric shower replaced with a new Mira Sprint unit, restoring reliable hot water to their bathroom while maintaining the existing electrical setup.
First fix electrical installation for a kitchen renovation in Newquay, including cable installation for dedicated socket circuits, appliance connections, consumer unit upgrade, and preparation for final fitting.
Replacing an outdated BP Pulse charging unit with a new Hypervolt 3 Pro charge point for a property in Devoran, incorporating load monitoring technology to protect the home’s electrical system whilst delivering reliable 7.4kW charging.
Working on a period property in Camborne, we reconfigured the electrical supply within an inglenook fireplace to accommodate an electric fire unit and atmospheric lighting, combining surface-mounted conduit work inside the chimney breast with concealed cabling throughout the rest of the room.
Installation of a 7.4kW Ohme ePod charging point with dedicated consumer unit and load monitoring system for a residential property in Hayle, Cornwall.
A property in St Ives required urgent electrical work following an inspection that identified several safety concerns. The job involved replacing the existing consumer unit with a modern 11-way RCBO board featuring surge protection, upgrading the meter tails, and rectifying multiple EICR observations including a neutral fault that needed investigation and repair.