Our Projects

Check out some of our most recent projects below.  Click on a project for more information.

February 2026

Complete kitchen extractor replacement with external venting through soffit and light switch upgrade for a home in Lostwithiel, providing improved ventilation and updated lighting controls.

February 2026

Installation of two Rointe electric radiators in a Newquay property, providing efficient electric heating solutions for a hallway and bedroom with professional fitting and commissioning.

January 2026

Upgrading an oil combi boiler heating system with a Hive Active Heating Control system in Roche, including smart thermostat, receiver and Wi-Fi hub installation with full network integration and commissioning.

January 2026

First fix kitchen electrics completed for a home in Shortlanesend, Cornwall, involving socket circuit extensions and cooker circuit alterations to accommodate a reconfigured kitchen layout.

January 2026

Installation of a humidistat-controlled extractor fan in a Chacewater kitchen, complete with external venting, dedicated switching, and concealed cabling prepared for decoration.

January 2026

Installing a 7.4kW Sync EV charge point for a Falmouth property, complete with load monitoring technology to prevent electrical system overload and protect the existing infrastructure.

January 2026

A property in Bodmin required a complete consumer unit upgrade alongside remedial works identified during electrical safety testing. The existing installation had reached the end of its service life, prompting the need for a modern replacement with integrated surge protection to safeguard connected electronics and bring the system in line with current regulations.

January 2026

Installation of a 7.4kW MyEnergi Zappi EV charge point at a property in Cubert, making use of existing infrastructure whilst upgrading the electrical protection to support reliable electric vehicle charging.

January 2026

Complete first-fix electrical installation across a first floor conversion in Bodmin, featuring three bedrooms with en-suite and wardrobe facilities, plus family bathroom and landing areas, all within a timber frame construction.

January 2026

Adding convenience and functionality to a Falmouth home through the installation of three new double socket outlets across living and dining spaces.

January 2026

Relocating a heating air sensor to a more practical position above kitchen cupboards in Mylor Bridge, extending control cabling and making good where necessary to maintain a clean, professional finish.

January 2026

Installing four Easee One electric vehicle charge points across two Seasalt industrial sites in Falmouth and Redruth, complete with payment systems and load balancing technology to support sustainable transport infrastructure.
NAPIT Approved Electrical Logo
BPEC
City & Guilds
Ohme
HyperVolt
EO
My Energi
Lutron
GivEnergy
Loxone
read more
read less