Consumer Unit

Check out some of our most recent projects below.  Click on a project for more information.

April 2026

Following an Electrical Installation Condition Report, this Newquay property required a full consumer unit replacement along with several remedial works to bring the installation in line with current wiring regulations. A new 7-way RCBO consumer unit with integrated surge protection was installed, the incoming tails were upgraded, and additional compliance work was carried out throughout the property.

March 2026

First fix electrical installation for a kitchen renovation in Newquay, including cable installation for dedicated socket circuits, appliance connections, consumer unit upgrade, and preparation for final fitting.

March 2026

A residential property in St Austell required the consolidation of two separate distribution boards into a single modern consumer unit with integrated surge protection. The existing setup included a main board and an Economy 7 board, both of which were replaced with a 15-way RCBO consumer unit featuring an SPD. The incoming meter tails were upgraded to 25mm double insulated cabling, and all circuits were tested to current 18th Edition standards with a full Electrical Installation Certificate issued upon completion.

February 2026

A comprehensive electrical upgrade for a Truro property, including modern consumer unit installation with surge protection, bathroom LED downlight replacement, new kitchen ventilation, and dedicated power supply for a bathroom wall heater.

February 2026

A residential property in St Austell required a complete electrical safety assessment and consumer unit upgrade. Following a thorough inspection and testing of the existing installation, we replaced the outdated board with a modern 21-way RCBO consumer unit featuring integrated surge protection, upgraded the meter tails to 25mm cabling, and resolved identified safety concerns to bring the installation in line with current regulations.

February 2026

A domestic property in St Austell received a complete consumer unit replacement featuring integrated surge protection and RCBO protection for individual circuits. The installation included upgraded 25mm meter tails, full electrical certification, and the replacement of outdated fluorescent garage lighting with modern LED batten lights, alongside fault finding work to resolve an intermittent tripping issue on the lighting circuit.

January 2026

A property in Bodmin required a complete consumer unit upgrade alongside remedial works identified during electrical safety testing. The existing installation had reached the end of its service life, prompting the need for a modern replacement with integrated surge protection to safeguard connected electronics and bring the system in line with current regulations.

January 2026

We recently completed a project in Falmouth, focusing on a full consumer unit replacement with modern surge protection. This job also involved the careful alteration of living room sockets to accommodate a wall-mounted TV and a new fireplace, as well as an essential repair to rodent-damaged wiring in the kitchen, significantly improving the home’s electrical safety and functionality.

December 2025

We relocated and replaced an existing consumer unit with a modern flush mounted consumer unit, positioned at high level in the hallway of this Newquay property. The work included extending and rerouting cabling to accommodate the new location, alongside utility room socket improvements, all carried out to comply with 18th Edition wiring regulations.

December 2025

This project in Truro involved upgrading a property’s electrical system by replacing two outdated consumer units. We consolidated all circuits into a single, modern 20-way board complete with individual RCBO protection and an integrated Surge Protection Device (SPD) to safeguard sensitive electronics.

December 2025

A recent project in Looe involved replacing an older fuse box with a modern, fire-rated consumer unit. The new installation included individual circuit protection and an integrated Surge Protection Device (SPD). We also carried out a full electrical inspection and testing of the property’s circuits, rectifying any issues to align with current safety regulations.

November 2025

Replacement of a corroded outdoor consumer unit with a new IP65-rated installation housed within a protective meter box enclosure in Camborne, including upgraded RCBO protection and full certification.